Interior Lobby Area

First Floor Plan

Second Floor Plan
Existing Structural Clay Tiles and Marble Panels

Marble Panel Lateral Reattachment

Detail- Marble Anchor

Detail- Marble Anchor at Ceiling

Ceiling Detail

Ceiling Demo
Architect of Record: John Starr
Project Manager: Julie Arnold
Architectural Designer: Sophia Mack
This project was focused on repairing, removing, and replacing marble panels on the interior of the lobby building at the TVA Cherokee Dam. The objective was to reduce costs by replacing as few panels as possible, without damaging the panels which are not being removed or repaired.